|
|||||||||||||||||||||||||||||||||
AMBER Archive (1999)Subject: PME question
From: francy_at_mvcch3.unica.it
Hi,
I have a question about PME.
in sander input I set BOXX, BOXY etc. as follow (the BOX values taken
(....)
&end
in sander output I find:
(.....)
EWALD SPECIFIC INPUT:
Box X = 46.402 Box Y = 46.296 Box Z = 57.309
(...)
2. CONTROL DATA FOR THE RUN
(...)
NTB = 2 IFTRES= 1 BOXX = 51.261
(....)
My question is: where do the last values of BOXX, BOXY and BOXZ come from?
thanks in advance,
francesca
| |||||||||||||||||||||||||||||||||
|